Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-includes/functions.php on line 6121

Deprecated: Required parameter $postsPerPage follows optional parameter $category in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/themes/a1-elementor/functions.php on line 317

Deprecated: Required parameter $postsPerPage follows optional parameter $category in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/themes/a1-elementor/functions.php on line 336

Deprecated: Required parameter $field follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 739

Deprecated: Required parameter $post_id follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 739

Deprecated: Required parameter $field follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 805

Deprecated: Required parameter $post_id follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 805
SEJERØ HAVN, NYT LEDEVÆRK – Specialist og rådgiver i havne- og vandbygninger | A1 Consult A/S
SEJERØ HAVN, NYT LEDEVÆRK

SEJERØ HAVN, NYT LEDEVÆRK

A1 Consult har forestået projektering og udbud ifm. etablering af nye ledeværker i Sejerø Havn. Udfordringen i nærværende projekt var, at udbredelse af ledeværket ud i havnebassinet skulle minimeres, ligesom lasterne der overføres til den bagvedliggende kaj, skulle minimeres.

Formålet med de nye ledeværker er at beskytte færgen, såvel som kajanlæg, ved anløb ifm. sydlige vinde.

 

Fakta om projektet

  • 30 m sammenhændende ledeværk
  • Vanddybde 4,0 á 4,5 m
  • Højde af ledeværk, 2,8 m

 

Kunde

Kalundborg Kommune

Periode

2020-2021

Anlægssum

2,1 mio. kr. ekskl. moms