Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-includes/functions.php on line 6121

Deprecated: Required parameter $postsPerPage follows optional parameter $category in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/themes/a1-elementor/functions.php on line 317

Deprecated: Required parameter $postsPerPage follows optional parameter $category in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/themes/a1-elementor/functions.php on line 336

Deprecated: Required parameter $field follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 739

Deprecated: Required parameter $post_id follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 739

Deprecated: Required parameter $field follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 805

Deprecated: Required parameter $post_id follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 805
2022 – Specialist og rådgiver i havne- og vandbygninger | A1 Consult A/S

Næstved Harbor, Handover of project  

Renovering af Vestre kaj og Vestre mellemkaj_Næstved Havn

Næstved Harbor, Handover of project   Yesterday, the project concerning the renovation of Vestre Kaj and Vestre Mellemkaj was handed over. The handover of the successful project was well-accompanied by the most beautiful December weather. 

Aarø Harbor, Condition assessment 

Aarø Havn_Tilstandsvurdering_A1 Consult

Aarø Harbor, Condition assessment  On behalf of Haderslev Municipality, we have performed a conditional assessment of Aarø Harbor. Observations and damages are summarized in a report, and a maintenance plan has been prepared with a budget for the next five years.   

Hirtshals Harbor 

Hirtshals Harbor  The preliminary geotechnical feasibility examinations concerning the expansion of Hirtshals Harbor have begun. Per Aarsleff is responsible for drilling and CPTs as well as extracting environmental samples.