Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-includes/functions.php on line 6121

Deprecated: Required parameter $postsPerPage follows optional parameter $category in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/themes/a1-elementor/functions.php on line 317

Deprecated: Required parameter $postsPerPage follows optional parameter $category in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/themes/a1-elementor/functions.php on line 336

Deprecated: Required parameter $field follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 739

Deprecated: Required parameter $post_id follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 739

Deprecated: Required parameter $field follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 805

Deprecated: Required parameter $post_id follows optional parameter $i in /home/adminm/htdocs/old.a1consult.newsite.side-walk.dk/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 805
Aarø Harbor, Condition assessment  – Specialist og rådgiver i havne- og vandbygninger | A1 Consult A/S
Aarø Havn_Tilstandsvurdering_A1 Consult

Aarø Harbor, Condition assessment 

Aarø Harbor, Condition assessment 

On behalf of Haderslev Municipality, we have performed a conditional assessment of Aarø Harbor. Observations and damages are summarized in a report, and a maintenance plan has been prepared with a budget for the next five years.